Birmingham Metropolitan College - Stourbridge College




Sector:

Education


Location:

Birmingham


Value:

£3.1m


Undertaken in partnership with Birmingham Metropolitan College, this scheme involved the upgrade to an existing college building which included the demolition and rebuild of an existing reception building.

Clegg refurbished the existing three storey building which links the reception and infil block. Works also included the overclad of existing buildings.

Site Challenges

Through constant communication between the site team and college  we were able to ensure the existing facility continued uninterrupted. This included creating site specific access and egress plans.

Achieving BREEAM 'Excellent'

The scheme achieved a BREEAM ‘Excellent’ rating, with low carbon features including:

  • Biomass boiler
  • TermoDeck (exposed soffit) thermal mass storage system
  • Lighting using low energy fittings with daylight linked dimming
  • Open plan offices using multiple switching to limit the extent of lighting that can be used

This site uses cookies. Cookies are used for core functionality and for ads personalisation.
By continuing your visit, you accept their use as set out in our Privacy and Cookie Policy.
Accept All Cookies Cookie Preferences

Sorry, this item is currently out of stock.
We currently hold [remaining-stock] units of this item in stock. The remainder will be put on back order.
You cannot order more of this item than we currently hold in stock.
You must order at least [min-order-qty] of this product.
You must order at least [min-order-qty] of this product. We currently hold [remaining-stock] in stock. The remainder will be put on back order.